Search Technical Articles:
Home
About007
Exhibitions
Product Categories
Advertising
Search Help
Feedback
  Welcome to our website!
Welcome! Now:  
Other Technical Articles
· Automation boosts injection moulding quality
( 2009-03-20 )
· Film-backed thin sections injection moulded
( 2009-03-20 )
· Demo Mould gives insight into injection moulding
( 2009-03-05 )
· Kistler upgrades injection monitoring system
( 2009-03-03 )
· Krauss-Maffei shows injection moulding technique
( 2009-03-03 )
· Simple Measures can improve Weak Weld Lines In Injection Molding
( 2009-02-20 )
· Jomar launches “world’s largest” injection blowmolding machine
( 2009-02-16 )
· Types of injection molding machines
( 2009-02-13 )
· Design of the injection mold
( 2009-02-12 )
· Injection Work under Bad Weather Condition
( 2009-02-11 )
· Basic Knowledge on Plastic Injection Molding
( 2009-02-10 )
· Sinking Problem in Plastic Injection Molding Process
( 2009-01-09 )
· Vertical Machines with Rotary Tables Go Larger
( 2008-12-30 )
· Injecting Delaminations and Hollow Planes
( 2008-12-29 )
· Multinational microcellular molding
( 2008-12-26 )
· New twin platens by Italtech Inc.
( 2008-12-26 )
· Basics of Injection Molding
( 2008-12-25 )
· Metal Injection Molding: the Choice for Small, Complex Parts
( 2008-12-24 )
· Innovations in Injection molding machinery
( 2008-12-24 )
· Excellent growth potential for injection molded wood plastic...
( 2008-12-23 )
 
Technical Articles
 
Home >> Technical Articles >>Injection Work under Bad Weather Condition
Injection Work under Bad Weather Condition
Time: 2009-02-11
 A cold substrate will cause an increase in the viscosity of the injection resin. This slows down the rate of injection. A hot substrate results in premature jelling of the resin with sequential loss of penetration. During extremely hot weather an open bridge deck may exceed temperatures as high as 140 Degrees F. Special precautions are necessary before injection work can be done in such weather.
 
The precaution may be shading the bridge, and water cooling. Always check substrate temperature. The injection machine and its hoses require isolation from extremes of temperature.
 
Epoxy injection undertaken during cold weather also requires special precautions.
 
When doing injection work in freezing conditions, determining if there is ice present in the crack is critical. Determining if a cracks inner surfaces are ice coated, is equally important. When injecting under these conditions, the resin will not bond to the substrate and no structural rebonding will result. It is usually safer to preheat the portion of the structure you are injecting.
 
When heating a structure do not overheat it. This closes the crack. When removing heat, the crack may rapidly open. This will rupture the resin before it has a chance to achieve final cure. In most cases, indirect heating is much more desirable than direct heating. Maintain heat for several hours before and after the injection application.
Browse Alphabetically :blow molding machine
Copyright © 2008 blow-molding-machine007.com All rights reserved.